Projects

Quick Project Turnaround | South Yarra

Location: South Yarra Challenge: Short duration turnaround with a team of 12 men completed 500m2 multiple coats in a little over 14 hours. Outcome: Delivered a Hychem methylmethacrylate or PUMA system to waterproof bridge decks prior to rail & asphalt

Emergency Repairs

Remcon Group attending to an urgent response. Day or night. Our team works 24/7 to get the job done. Issue: Emergency Repairs to Expansion Joints Solution: We attended the site quickly to remove, repair and re-instate this plate in a single overnight shift.

Robotic Demolition

A return client contacted us informing us that an escalator didn’t fit through to the desired installation location. If the escalator would need to be reordered it would delay the project schedule by 6 months. Remcon was able to provide a timely solution and make it fit. Solution: By removing 400mm thick, 20m² of concrete […]

Box Hill Central

REMCON Group have been awarded Box Hill Central with long term client MABEN Group Looking forward to delivering a mutually rewarding CFRP Project Consisting of: 3000 Lin/m FRP Laminate 500 Lin/m BC Rods 2500 Shear Bars As well as 3D concrete slab survey and multiple tendon truncations

Mitchell House

Remcon Constructions is pleased to announce the completion of the façade works to the Mitchell House building. Remcon was proud to be involved with the façade updating on such an iconic CBD structure. The works were completed using a combination of swing stages and industrial rope access with gantries installed around the footpath for public […]

Hexion Chemicals

REMCON Constructions were very pleased to continue our involvement with Hexion Chemicals by securing a 3rd contract to undertake concrete remediation works at their facility at Deer Park. All contracts have been undertaken during the annual scheduled shutdown period which takes place during the Christmas holiday period. The contracts ran 24/7 from the 18th December […]

82 & 88 Maling Road Canterbury

REMCON Constructions were contacted by Infracorr Consulting to undertake the remediation of 2 heritage buildings on Maling Road in Canterbury. The parapets, string courses and decorative features had corroded over the years and were showing signs of structural weakness including dislodgment and failure at fixing points. REMCON Constructions accompanied by Infracorr were able to find a […]

Monash Childrens Hospital

REMCON Constructions were contacted by Lend lease to assist with the supply and placement of a concrete slab to house a significant water tank facility at the new Monash Children’s Hospital. This challenge was the short turn around period of 4 days prior to the long weekend which would enable sufficient curing of the slab […]

Chum Creek Water Tank Refurbishment

REMCON Constructions tendered for the remediation works at Chum Creek in April of 2014, and were sucessfully awarded this project later that month by Simpson Constructions Company. Documented by MWH, a thorough investigation was undertaken and comprehensive reports scheduling all items requiring repair and proposed methodolgies for the repairs were completed. In early June 2014, […]