Camberwell Central

Due to a reconfiguration of the existing carpark slab and column strengthening works were required to meet the revised loads.

The works were completed in and out of hours with the shopping centre continuing to trade during the installation.

3D slab scanning was undertaken during the investigation process to locate the existing reinforcment and post-tensioning tendons. Once located the tendons were then exposed and the strands truncated to enable the PT cable to be demolished safely.

The strengthening part of the works involved the supply and installation of 500 metres of Sika Carbour S1214 carbon fibre in various locations on the soffit of the concrete slab. The under slab works were required to be completed around existing services and cable trays.

The strips were fixed using approved Sikadur adhesive. Remcon undertook the setout survey and provided the blasting equipment and scaffold required to complete the work iTP’s were completed and all strips cleaned and prepared for handover. All engineering certification and 1507 forms were submitted to the client.

Should you wish to contact us regarding your next carbon fibre project please do not hesitate to call.